1-1/2 ID 12V DC 1/3HP Motor Hybrid Frame Hose Reels
Signature Features
- Professional grade heavy duty steel construction
- Durable proprietary CPC™ powder coat finish
- Rolled edges & ribbed discs provide strength & safety
- Industry leading 2 year manufacturer's limited warranty
- Made in the U.S.A. – Sold & Supported Worldwide
Possible Fields of Application
- High-flow Watering
- Construction Vehicles
- Fire Apparatus
- Water Trucks
- Chemical Fluid Transfer
- Bulk Liquid Handling
- Mining Operations
- OEM Systems
COXREELS - 1680 Model Hand Crank & Motorized Hybrid Frame Hose Reels
This feature-rich reel has a wide array of components configurations and many possible sizes to choose from, providing a robust reeling platform for any conceivable application and making it the most versatile design available on the market today.
The 1600 Series offers a generous variety of drum and disc size combinations for many dimensions and hose length capacities and is currently available in 1” and 1-1/2” NPT, BSP or NST nickel plated swivel inlets. Targeted for the tough demands of customers requiring various dimensional choices, the series offers flexible size envelopes forn any given hose capacity. The 1600 series hybrid frame offers unique accessories and upgrades which allow for application tailoring resulting in enhanced performance and usability.
Swivel
- External fluid path with nickel plated steel 90° full-flow NPT swivel inlet
- Swivel Seals: NITRILE
Design & Structure
- All welded hybrid frame with added bolts
- Exclusive low profile outlet riser & open drum slot design for flat smooth hose wrap
- Permantly lubricated self-aligning pillow block bearings for trouble-free & smooth rotation
- Adjustable tension brake to prevent "free-wheeling" during operation
- (On hand crank models) Long-handled locking pin to secure reel from rotation during transport or storage
Retraction
- Reliable chain & sprocket drive on motor driven models
- Solid steel direct hand crank with smooth round handle
- All metal bevel crank and gear construction